Case Study - Total Laminate Systems saves money and time by fitting our GW1 product.
Total Laminate Systems saved in excess of 20% and are now fitting GW1s to the remainder of their fleet.
Case Study - Isle of Wight Cricket Club
Testimony
'The GW 4 fuel conditioners were fitted onto the fuel lines to each of our two ACV Heatmaster oil-fired boilers in just a few minutes.'
"Although we have only had the GW 4 Fuel conditioners fitted for a few weeks we have already noticed our hot water system being more energy efficient since its fitting. We would recommend this to anyone who wishes to reduce costs and have a more efficient running fuel system" Mike Scott, General Manager, Newclose County Cricket Ground, IOW
Case Study - Commercial Fish & Chips shop saves money and time by fitting our GW4 product.
Testimony
'I have always experienced problems in obtaining sufficient hot water from the HW/CH boiler supplying the shop, in that the boiler has always taken a considerable time before producing water at the temperature we require. Since fitting the GW4 fuel conditioner we now enjoy almost instant hot water at the required temperature. As a consequence we are wasting less water (reducing the cost of the water and it's disposal) and saving the waiting time I used to waste. I am extremely pleased with the result, and will be fitting fuel conditioners to my deep-fat-fryers, following their annual service in December. As this is a hard water area, I will also at that time be fitting a water conditioner to the water supply to the HW/CH boiler to prevent the build-up of lime-scale in the boiler.' Frank, Proprietor, Seafoods, West Moors, September 2009














